South Omaha BID Board Meeting Minutes - October 21, 2026

1 hour ago
3 min read

Location:

Pesek Law, LLC 4826 South 24th. St.

Date:

October 21, 2026

Time:

10:00 AM

Present: Ross Pesek (Board Chair), Marcos Mora (Board Member), Jennifer Acosta (City of Omaha), Javi Saldana (City of Omaha), Karen Pesek, Lucia Pedroza-Estrada, Bruce Niedermeyer, Cary Thompson (RDG), Bob Elkins, Mike Holden, Austin Arens (RDG, landscape architect/certified arborist).


Meeting Minutes


  1. Welcome & Introductions

    1. Ross welcomed board members and opened the meeting.

    2. The meeting focused on preliminary design plans for the South 24th Street streetscape improvement project from L Street to E Street, funded through an ARPA grant.

  2. Approval of Minutes

    1. No quorum- September minutes were not approved.

  3. South 24th Street Streetscape Project Background

    1. The design team reviewed the history of the existing streetscape, which was built in phases through 2010. The current project scope focuses on 24th Street from L Street to E Street; some improvements along 25th Street will be part of the adjacent Plaza de la Raza project.

    2. Preliminary plans include colored or textured paving, clay or concrete pavers, green light fixtures, benches, bike racks, ADA-accessible sidewalks, and bump-outs with in-ground planters. Bike lanes and on-street parking are expected to remain, with curb changes limited primarily to bump-out intersections.

    3. The design team will send preliminary plans to the BID for review. Planting locations and designs will consider business access, ACI Overlay District requirements, and low-maintenance, drought-tolerant species.

  4. Existing Infrastructure: Lighting, Trees, Irrigation & Tile

    1. Attendees discussed irrigation challenges, trees in small containers, damaged decorative tile, and missing glass or acrylic inserts in existing light structures. The BID currently supplements watering manually, and Master Gardeners volunteer on planting and gardening.

    2. The design team will explore durable, easier-to-maintain replacement inserts for the light structures. The original tile studio has extra tiles available, and a separate Turnback Tax Credit grant application has been submitted for tile replacement. The BID will explore storage options for extra tile.

  5. Parking & Driveway Access

    1. Parking concerns during construction and the proposed parking garage were discussed. Ross expressed the view that a garage may not necessarily be given expected parking availability after the project is complete.

    2. The design team will evaluate redundant driveways near intersections where closures could improve pedestrian safety. Any proposed changes will be considered with property owners on a case-by-case basis, with access maintained.

  6. Maintenance Responsibility & Water Access

    1. Long-term maintenance, watering, and snow removal were key discussion points. Snow removal remains the responsibility of individual property owners, not the BID.

    2. The design team raised the possibility of including a maintenance endowment in the project budget to fund professional maintenance for approximately four to five years after installation. Details about funding, responsibilities, and structure remain to be determined.

    3. Plant selection and irrigation plans will account for inconsistent access to water spigots along the corridor and prioritize low-maintenance, drought-tolerant plants.

  7. BID Boundary Extension

    1. The group discussed extending the South Omaha BID boundary from K Street to E Street to align maintenance oversight with the streetscape project. Extending the existing BID was viewed as pre

      ferable to creating separate maintenance arrangements.

    2. The extension would require a formal process, including notice to property owners in the expanded area, a public hearing, and City Council action. The board will continue discussing the proposal and BID capacity.

  8. Property Owner Open House

    1. A property owner open house for the L Street to E Street corridor is scheduled for November 18, 2026, with sessions from 9:00 AM to noon and 2:00 PM to 7:00 PM.

    2. The City will coordinate formal notices to property and business owners. The design team will prepare draft communication, and Lucia Pedroza-Estrada will coordinate with the City and design team on logistics.

  9. Project Schedule

    1. Design development is ongoing, with property owner engagement planned for November. The project is targeting construction completion by the end of 2027, with a possible extension into 2028 being explored because of the ARPA funding timeline.

  10. Action Items / Next Steps

    1. Bruce Niedermeyer / Cary Thomsen (RDG Design Team): Send preliminary plans to the BID; explore replacement options for the light inserts; coordinate with Bob Hopkins on plant selection; prepare a draft notice for the November 18 open house; continue coordination on ACI Overlay District compliance; evaluate potential driveway closures; and investigate a possible maintenance endowment.

    2. Lucia Pedroza-Estrada: Coordinate with the City and design team on formal notices, open house logistics, and communication with property and business owners along the L-to-E Street corridor.

    3. Ross Pesek / BID Board: Explore storage options for extra tile; continue discussions with BID members about extending the boundary from K Street to E Street; and relay community feedback on parking, planters, and maintenance to the design team.

    4. Bob Elkins / Master Gardeners: Advise the design team on plant selection, water access, and maintenance when a landscape plan is available; continue coordinating interim watering and gardening.

    5. Cesar Garcia: Provide further information on the maintenance endowment concept, funding sources, and responsible parties; pursue a possible extension of the ARPA funding deadline into 2028.


  11. Closing

    1. Meeting adjourned at 10:58


Comments


CONTACT US

We'd love to hear from you! Submit any questions or comments below. Together we can continue to make a community for all. 

Thanks for submitting!

ADDRESS

4826 S 24th St.

Omaha, NE 68107

EMAIL

© 2026 by South Omaha Business District. Proudly created by Supera Designs.

bottom of page